Search
You searched for Telegram会员 代开(SMMFS.COM)飞机拉人帮充会员服务,Doe
Results 231 – 240 of about 247.
Refine by:
- All results
- Documents
-
What we don't licence
It is generally the case that you will need planning permission to change from one use class to another, although there are exceptions where the legislation does allow some changes between uses.
https://www.kingston.gov.uk/licensing/dont-licence -
Kingston Council launches Sustainable September to tackle climate change and increase environmental awareness
While supporting communities is at the heart of everything the council does, it is also working to become a leading borough in protecting and enhancing the natural environment.
https://www.kingston.gov.uk/news/article/325/kingston-council-launches-sustainable-september-to-tackle-climate-change-and-increase-environmental-awareness -
Kingston pub trail
The pub satisfies everyone with its three separate areas, one aimed at sports and darts board, the middle one which has a large screen tv meant for adults and the lower area is aimed at families and it does not have a bar.
https://www.kingstonheritage.org.uk/pubtrail -
How accessible this website is
This does not meet WCAG 2.1 success criterion 4.1.2 (name, role value).
https://www.kingstonheritage.org.uk/legal/accessibility-statement-kingston-heritage-service/1 -
How accessible this website is
This does not meet WCAG 2.1 success criterion 4.1.2 (name, role value).
https://www.kingstonheritage.org.uk/legal/accessibility-statement-kingston-heritage-service?documentId=3&categoryId=21 -
How accessible this website is
This does not meet WCAG 2.1 success criterion 4.1.2 (name, role value).
https://www.kingstonheritage.org.uk/legal/accessibility-statement-kingston-heritage-service -
Flood Risk Assessment Guidance
Change of Use: Developments classified as a ‘Change of use’ if - (i) the application does not concern a major development; and (ii(a)) no building or engineering work is involved; or (ii(b)) the building or engineering work would be permitted development were it not for the fact that the development involved a change of use (such as the removal of internal dividing walls in a dwelling house to provide more spacious accommodation for office use).... development that does not increase the size of buildings (e.g. alterations to external appearance)
https://www.kingston.gov.uk/strategic-flood-risk-assessment/flood-risk-assessment-guidance -
Coping with extreme weather
When a heatwave does occur, it is important to be prepared and take steps to reduce the risks both for yourself and those friends and relatives that may be vulnerable.
https://www.kingston.gov.uk/emergency-planning/coping-extreme-weather/2 -
Client, designer and contractor duty holder responsibilities
if a domestic client does not appoint either a principal designer or principal contractor, then the designer in control of the design phase of the project is the principal designer and the contractor in control of the construction phase of the project is the principal contractor.
https://www.kingston.gov.uk/building-control/client-designer-contractor-dutyholder-responsibilities -
Spotlight Newsletter
How much does a ‘stitch in time’ save?
https://www.kingston.gov.uk/get-involved-housing/spotlight-newsletter