Search

You searched for Ʊ׶ 100mg Ʊ׶Ǹ.r-e.kr ˸ ǰ ŻƮ ? ʸ ¶ ԻƮ þ˸ ǰ Ǹ Ʈ GHB ǸŻƮ ī׶ 100mg ı

Results 581 – 590 of about 5181.

Refine by:

  • Register a death

    Deaths must be registered within 5 days from the date of death.

    https://www.kingston.gov.uk/deaths-1/register-death
  • Build a temporary vehicle crossing

    Highways Act 1980 s184 (3) & (9)... all temp crossovers must be constructed to the following specification.  100mm of type one, compacted in two layers of 50mm type one, 150mm of concrete 30N (dry lean concrete must be compacted with a roller or whacking plate, a minimum of 4 passes must be made).

    https://www.kingston.gov.uk/highway-licences/build-temporary-vehicle-crossing
  • Put up scaffolding

    S.169 Highways Act 1980)

    https://www.kingston.gov.uk/highway-licences/put-scaffolding-1
  • Supplementary Planning Documents

    The guidance took effect from Monday 3 June 2013 and applies to all new planning applications for qualifying development submitted on, or after, that date.... Any such application must be made no later than 3 months after the date of adoption, namely by 30 August 2013.

    https://www.kingston.gov.uk/policy/supplementary-planning-documents/6
  • School Streets

    School Street trial began on 4 September 2023.... If you have any issues with registering your vehicle/s, please email schoolstreets@kingston.gov.uk or call 0208 547 5000... The scheme is set up as an ‘Experimental Traffic Management Order’, and these can be in place for a minimum of 6 months and up to 18 months, whilst we gather local feedback.The Experimental Traffic Management Order consultation started on 4 September 2023 and closed 3 March 2024 and the feedback received will be used to review the scheme.

    https://www.kingston.gov.uk/sustainable-transport-safer-greener-healthier-travel/school-streets/5
  • Road resurfacing

    This was planned for 2 nights of work, on the 27 and 28 March but the first night of work was stopped due to an equipment breakdown and bad weather.

    https://www.kingston.gov.uk/roadworks-maintenance/road-resurfacing/2
  • Healthy Streets

    Orders last up to 18 months or 6 months if affecting a footway that is separate from a main highway.

    https://www.kingston.gov.uk/sustainable-transport-safer-greener-healthier-travel/healthy-streets/2
  • Healthy Streets

    On 3 November 2022 Surbiton Neighbourhood Committee agreed to engage with residents and stakeholders about potential improvements that could be made in the area.

    https://www.kingston.gov.uk/sustainable-transport-safer-greener-healthier-travel/healthy-streets/3
  • Street naming and numbering

    the name(s) should, when possible, have a proven historical connection to the land intended for development.... the name(s) should not conflict or duplicate any name(s) already in use within the borough or neighbouring boroughs.... We advise that you check the name(s) by contacting us.

    https://www.kingston.gov.uk/applications/street-naming-numbering-2/2
  • Local Land Charges search

    Please note only one person (company) is permitted for each 1 hour slot.... Please be aware that RB Kingston holds Part 3 of its Register in accordance with Rule 7 of the Local Land Charges Rules 1977.

    https://www.kingston.gov.uk/planning-development/local-land-charges-search/4